Technical Parameters
Model | OL-385E |
Dehumidifying Capacity | 30L/day(30ºC, 80%) |
Scope of Application | 30~40m2 |
Supply voltage | AC220-240V/50Hz |
Rated Input Current | 2.2A |
Rated Input Power | 425W |
Operating Temperature | 5~38ºC |
Protection Mode of Compressor | 3-minute Delaly Start |
Refrigerant | R134a |
Mode of Defrosting | Auto |
Circulating Air Volume | 180m3/h |
Water Tank Volume | 3L |
Mode of Drainage | Water Tank/Tube Continuous Drainage |
Packing Dimension(D*W*H) | 330*370*664mm |
Net Weight | 16kg |
Gross Weight | 18kg |
Function and Feature
1.Functioning Principle: Refrigerant drying
2.Rolling piston compressor
3.Automatic Defrosting Mode:Electric
4. Hygrostat-controlled Automatic Dehumidification mode
5.Selectable ioniser
6.Warming Lamp Light when Water Tank is full
7.Air Filter easy to remove and easy to clean
9.R134a Friendly Refrigerant
10.Synthetic material housing
11.Mobility: Plastic castors/Handhold(s)
12.Protected control panel
13.Integrated outlet to allow the condensate to drain off when not supervised in continuous mode
FAQ :
Q: Are you a trading company or manufacture?
A: As one of the oldest manufactures of dehumidifiers and
humidifiers,we are now taking the leading position of cooling
industry in mainland China. We have more than 300 employees with more
than 25engineers and 4 production lines.
Q: Do you accept OEM?
A: Yes, we can accept OEM, and we have the professional designer to
help you design your logo.
Q: Can I buy a sample for testing ?
A: Yes, we can supply you with a sample. for most of the
models,we have them in stock. we can supply you with the
sample within 7 days after we get your payment.
Q: Can I visit your factory?
A: We warmly welcome you come to visit us at Hangzhou city,
Zhejiang province. You can take the airplane to Shanghai, then
take the fast train for 50 minute to Hangzhou railway station,
we can pick you up at the railway station. If you fly to Hangzhou
directly, we can pick you up at the airport.
Q: Which certification this model have?
A: GS,CE,CCC
Q: What is the delivery time for bulk machine?
A:40days for first delivery,second is 30days